Right then – all work has now stopped on the conservatory due to the Christmas break and unfortunately its not quite finished and so it wont be done for Christmas Day. But we have decided that we are going to use it in any case.
Since my last post the following bits HAVE been done.
All the internal walls have been plastered.
The sparks have done the final fix and finished the fitting the electric although this isn’t live yet. The guy is coming tomorrow in his free time to make the circuit live so at least we will have heat and light for Christmas. The new light came in the week and Im hoping that it can be fitted tomorrow as well, as it weighs a ton and Im not entirely sure I can do it on my own.
Martin has finished all the glazing work and cleaned up and so his work is now complete bar the skirting boards. I have now paid for him in full.
The aircon has been fitted, but needs wiring up – again this might be tomorrow.
Wilf came round today and sanded back all the window sills and undercoated and satin wooded them, they look really good.
He has also slapped a thin coat of emulsion on the walls, but they are still very wet from the plaster, and will need a couple more coats.
As we dont have a floor down yet, and wont until the NY, Wilf has also donated a big old run to go on the conservatory floor, to make it look a little better.
So, what needs to be done?
- Plumber needs to channel the floor for the radiator and fit it.
- Floor will then need filling in.
- Tiles need to be laid in all three rooms
- Need to buy some furniture to go in it!